Influent Magnetic Meter Replacement
One of 10,000+ projects Taiyo tracks in Arizona.
Source: Dodge USA
The United States Section of the International Boundary and Water Commission (USIBWC) has a requirement to complete the replacement of the Influent Magnetic Flow Meter in the Nogales International Wastewater Treatment Plant (NIWTP). The Influent Magnetic Flow Meter replacement is required to maintain safe and reliable operations of NIWTP.
- Status
- Prospective
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Commercial
- Location
- Rio Rico, Arizona, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Influent Magnetic Meter Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The United States Section of the International Boundary and Water Commission (USIBWC) has a requirement to complete the replacement of the Influent Magnetic Flow Meter in the Nogales International Wastewater Treatment Plant (NIWTP). The Influent Magnetic Flow Meter replacement is required to maintain safe and reliable operations of NIWTP. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Arizona |
City | Rio Rico |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Commercial |
Article published date | 2024-08-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
