Influent Magnetic Meter Replacement
Sector: Waste Processing and Treatment • Location: Rio Rico, Arizona, United States of America
Source: Dodge USA
The United States Section of the International Boundary and Water Commission (USIBWC) has a requirement to complete the replacement of the Influent Magnetic Flow Meter in the Nogales International Wastewater Treatment Plant (NIWTP). The Influent Magnetic Flow Meter replacement is required to maintain safe and reliable operations of NIWTP.
- Status
- Closed
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Commercial
- Location
- Rio Rico, Arizona, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Influent Magnetic Meter Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The United States Section of the International Boundary and Water Commission (USIBWC) has a requirement to complete the replacement of the Influent Magnetic Flow Meter in the Nogales International Wastewater Treatment Plant (NIWTP). The Influent Magnetic Flow Meter replacement is required to maintain safe and reliable operations of NIWTP. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Arizona |
City | Rio Rico |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage, Commercial |
Article published date | 2024-08-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- Imola Avenue Rehabilitation (Soscol Ave to East End)
- Laguna Canyon Road , Road Improvements ( Segment 4 ) ( Phases 2 to 4 )
- Panorama Heights Drainage and Road Improvements
- Modjeska Grade Road , Road and Drainage Improvements
- Street Drainage Improvements ( Annual )
- Barrett Lane Drainage and Sidewalk Improvement
- Ronald Caspers Wilderness Park - Maintenance Building - Renovation
- West Bay Yards
