Influent Pumping System Improvements
Closed · North Carolina · Last reported May 2023
Source: Dodge USA
Scope - The proposed project includes replacing and upgrading components of the existing Brown Street Pump Station. These components include: the removal and complete replacement of pump and electrical controls, along with new standby generator and Automatic Transfer Switch, flow meter installation, bypass pump connection, wet well rehabilitation and coating, and all associated bypass pumping. The
- Status
- Closed
- Sector
- Power Generation (CCGT), Road, Waste Processing and Treatment, Government, Commercial, Water Supply and Storage
- Location
- Fairmont, North Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Influent Pumping System Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Scope - The proposed project includes replacing and upgrading components of the existing Brown Street Pump Station. These components include: the removal and complete replacement of pump and electrical controls, along with new standby generator and Automatic Transfer Switch, flow meter installation, bypass pump connection, wet well rehabilitation and coating, and all associated bypass pumping. The proposed project also includes the construction of an intermediate pump station along NC Hwy 130... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | North Carolina |
City | Fairmont |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Road, Waste Processing and Treatment, Government, Commercial, Water Supply and Storage |
Article published date | 2023-05-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- VALDOSTA - AIRFIELD ELECTRICAL IMPROVEMENTS
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
