logo

Infrastructure improvements at the Moose Creek Water Treatment Facility and Well Heads

Sector: Water Supply and Storage • Location: Ontario, Canada

Source: Infrastructure Canada

Project
Completed

This project will include the replacement of key infrastructure within the water treatment plant for the Village of Moose Creek, which services approximately 500 people. Replacement and rehabilitation will occur on the Chlorine Analyzer and the Chlorine Analyzer distribution system, replacing the Cl2 pump, and the high lift pump, replacing the pressure reducing valves for the drinking water supply

Project Information FAQ

Project Information

5 Q
The project “Infrastructure improvements at the Moose Creek Water Treatment Facility and Well Heads” is an infrastructure initiative in the Water Supply and Storage sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This project will include the replacement of key infrastructure within the water treatment plant for the Village of Moose Creek, which services approximately 500 people. Replacement and rehabilitation will occur on the Chlorine Analyzer and the Chlorine Analyzer distribution system, replacing the Cl2 pump, and the high lift pump, replacing the pressure reducing valves for the drinking water supply as well as the unit heater and flow meters on wells #2 and #3. The largest rehabilitation project within the Moose Creek Water Treatment Facility is the replacement of the well pumps for wells #1 and #2 as well as the cameras within each well. This replacement is high on the priority list for replacement as it is an integral piece of infrastructure for providing drinking water. The turbidity analyzer is also in need of replacing as its anticipated life cycle is coming due.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data