Infrastructure Improvements
Sector: Solar • Location: Topeka, Kansas, United States of America
Source: Dodge USA
This project includes the removal of two raised medians at the intersection of SW Plass Avenue and SW Shunga Drive. Additionally, there is to be a Solar Light Assembly erected at the intersection of SW High Avenue & SW Wayne Avenue. City project 261006.02. This project consists of removal of two raised medians at the intersection of SW Plass Avenue and SW Shunga Drive. The medians are to be replac
- Status
- Closed
- Sector
- Solar, Commercial, Cement, Road, Government
- Location
- Topeka, Kansas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Infrastructure Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project includes the removal of two raised medians at the intersection of SW Plass Avenue and SW Shunga Drive. Additionally, there is to be a Solar Light Assembly erected at the intersection of SW High Avenue & SW Wayne Avenue. City project 261006.02. This project consists of removal of two raised medians at the intersection of SW Plass Avenue and SW Shunga Drive. The medians are to be replaced with 2 asphalt on 7 reinforced concrete pavement on 6 aggregate base Type AB3. Additionally, t... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Kansas |
City | Topeka |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Solar, Commercial, Cement, Road, Government |
Article published date | 2024-07-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Solar projects in United States of America
- I-85 @ SR 1/US 27 - SOLAR PANEL FARM - TRACKING ONLY
- INSTALL ROOF MOUNTED PV SYSTEM 10 MODULES 2.6 KW
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 8.69 KW 22 PANELS
- PV SOLAR ROOF MOUNT SYSTEM 4.80 KW WIHT 12 MODULES
- AS PER MASTER PV PERMIT 202103084 SOHAY LINE BUILDING 16 UNIT 206 (7) MODULE 2.45 KW SYSTEM
- 8.19 KW ROOF MOUNT SOLAR INSTALL WITH (18) 455W MODULES AND (9) AP SYSTEM DS3-L MICROINVERTERS.
- INSTALL 4.4 KW PV ARRAY WITH (11) 400W MODULES.
- ROOF MOUNT SOLAR: (11) 400W MODULES AT 4.4 KW TOTAL
