logo

Infrastructure Upgrade in Marysville Begins

Sector: Metal • Location: San Jose, California, United States of America

Source: California Water Service

Project
Closed

Cal Water began an important water infrastructure improvement project in Marysville today that will ensure local customers and firefighters continue to have the safe, reliable water service they need for their everyday and emergency needs. The project includes the installation of 1,221 feet of new 6-, 8-, and 12-inch ductile-iron water main and replacement of all existing individual customer servi

Project Information FAQ

Project Information

4 Q
The project “Infrastructure Upgrade in Marysville Begins” is an infrastructure initiative in the Metal sector, located in San Jose, California, United States of America. Taiyo aggregates data on it from California Water Service.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Cal Water began an important water infrastructure improvement project in Marysville today that will ensure local customers and firefighters continue to have the safe, reliable water service they need for their everyday and emergency needs. The project includes the installation of 1,221 feet of new 6-, 8-, and 12-inch ductile-iron water main and replacement of all existing individual customer service connections. Crews will also install two new fire hydrants to improve access for firefighters. The original, primarily cast-iron main was installed before 1950 and nearing the end of its useful life. Installation will take place on 13th Street, between Ramirez Street and Swezy Street. "These improvements will benefit Marysville for years to come by protecting against leaks and ensuring we can continue to provide safe and reliable water service," said Operations Manager Mary Jones. "Replacing aging pipes before problems arise is one way that we provide quality, service, and value to our customers and protect against water loss." Work is being performed Monday through Friday between 7:30 a.m. and 5 p.m., and crews are making every effort to minimize any related traffic delays. Following installation, crews will flush the water main and test water quality samples before connecting individual customer service connections to the new main. Residents will be notified in advance of any planned shutdowns, which are typically scheduled between 9 a.m. and 4 p.m. All streets, sod, and landscaping impacted by the construction will be restored to as close to the previous condition as possible.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data