logo

Infrastructure works for developments at Kwun Tong Action Area

Sector: Commercial • Location: Hong Kong

Source: East Development Office

Project
Ongoing

The scope of the project comprises: (a) construction of new access roads L1 of about 120 metres (m) long and L2 of about 70 m long, and associated road modification and junction improvement works; (b) construction of an about 50 m long covered footbridge with associated lifts and staircases across Wai Yip Street to connect Hoi Yuen Road and KTAA; (c) modification of an existing public transport in

Project Information FAQ

Project Information

4 Q
The project “Infrastructure works for developments at Kwun Tong Action Area” is an infrastructure initiative in the Commercial sector, located in Hong Kong. Taiyo aggregates data on it from East Development Office.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

ongoing

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The scope of the project comprises: (a) construction of new access roads L1 of about 120 metres (m) long and L2 of about 70 m long, and associated road modification and junction improvement works; (b) construction of an about 50 m long covered footbridge with associated lifts and staircases across Wai Yip Street to connect Hoi Yuen Road and KTAA; (c) modification of an existing public transport interchange; (d) reconfiguration of Kwun Tong Vehicular Ferry Pier (KTVFP) and the associated dangerous goods vehicular (DGV) queuing area; (e) provision of the adjoining waterfront promenade and open space; (f) carrying out associated demolition and site formation, drainage, sewerage, waterworks, landscaping, electrical and street lighting works, utilities and other ancillary works; and (g) implementation of environmental mitigation measures for the proposed works.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data