INFRATRACK Solutions Test Track
Sector: Power Generation (CCGT) • Location: Graz, Austria
Source: Railway PRO
INFRATRACK Solutions utilizes a connection railway of a decommissioned coal-fired power station near Graz, Austria, as a specially equipped test track for rail vehicles. The site supports physical and software-based tests with measurement technology fitted on vehicles.
- Status
- Under Construction
- Sector
- Power Generation (CCGT), Mass Transit, Rail, Automotive
- Location
- Graz, Austria
- Updated
- 22 Jul 2026
- Source
- Railway PRO
ConstructChat
Ask ConstructChat about INFRATRACK Solutions Test Track
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | operational |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | INFRATRACK Solutions utilizes a connection railway of a decommissioned coal-fired power station near Graz, Austria, as a specially equipped test track for rail vehicles. The site supports physical and software-based tests with measurement technology fitted on vehicles. |
Original sector | Rail |
Location
Country | Austria |
City | Graz |
Source
Source | Railway PRO |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Mass Transit, Rail, Automotive |
Article published date | 2026-05-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
