logo
ProjectPlanned

Inga 3 Development Programme

Planned · Democratic Republic of Congo · Last reported Jun 2025

Source: International Water Power

A hydropower development programme in the Democratic Republic of Congo, supported by a US$250 million credit from the World Bank for the first phase. It aims to develop the largest power project in DRC with a potential capacity between 2 to 11GW.

Status
Prospective
Sector
Water Supply and Storage, Hydro, Power Generation (CCGT)
Location
Democratic Republic of the Congo
Updated
22 Jul 2026
Source
International Water Power

ConstructChat

Ask ConstructChat about Inga 3 Development Programme

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Inga 3 Development Programme” is an infrastructure initiative in the Water Supply and Storage sector, located in Democratic Republic of Congo. Taiyo aggregates data on it from International Water Power.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A hydropower development programme in the Democratic Republic of Congo, supported by a US$250 million credit from the World Bank for the first phase. It aims to develop the largest power project in DRC with a potential capacity between 2 to 11GW.

Original sector

Energy

Budget

Location

Country

Democratic Republic of the Congo (DRC)

Source

Source

International Water Power

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Hydro, Power Generation (CCGT)

Article published date

2026-03-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project