logo
Project

Inga III Basse Chute Project

Sector: Water Supply and Storage • Location: Democratic Republic of Congo

Source: International Water Power

A hydropower project in the Democratic Republic of Congo with a capacity of 4.8GW and a project cost of $18 billion.

Sector
Water Supply and Storage, Power Generation (CCGT), Hydro
Location
Democratic Republic of the Congo
Updated
22 Jul 2026
Source
International Water Power

ConstructChat

Ask ConstructChat about Inga III Basse Chute Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Inga III Basse Chute Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Democratic Republic of Congo. Taiyo aggregates data on it from International Water Power.

Participants

Not available for this record.

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A hydropower project in the Democratic Republic of Congo with a capacity of 4.8GW and a project cost of $18 billion.

Original sector

Power Generation

Budget

Location

Country

Democratic Republic of the Congo (DRC)

Source

Source

International Water Power

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Generation (CCGT), Hydro

Article published date

2025-09-16

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project