logo
ProjectPlanned

Inga III Hydroelectric Power Scheme

Sector: Power Generation (CCGT) • Location: Democratic Republic of Congo

Source: African Energy

The Inga III hydroelectric power scheme is part of the wider Grand Inga project in the Democratic Republic of Congo. It is a colossal hydropower project with a capacity of 11GW, aimed at significantly boosting the country's power generation capabilities.

Status
Prospective
Sector
Power Generation (CCGT), Hydro, Government
Location
Democratic Republic of the Congo
Updated
22 Jul 2026
Source
African Energy

ConstructChat

Ask ConstructChat about Inga III Hydroelectric Power Scheme

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Inga III Hydroelectric Power Scheme” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Democratic Republic of Congo. Taiyo aggregates data on it from African Energy.

Participants

Sponsoring Agency

Status

Original status

Planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Inga III hydroelectric power scheme is part of the wider Grand Inga project in the Democratic Republic of Congo. It is a colossal hydropower project with a capacity of 11GW, aimed at significantly boosting the country's power generation capabilities.

Original sector

Power

Budget

Location

Country

Democratic Republic of the Congo (DRC)

Source

Source

African Energy

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Hydro, Government

Article published date

2025-06-07

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project