Inga Power Rehabilitation Project
Sector: Government • Location: Congo (Democratic Republic)
Source: European Investment Bank (EIB)
- Status
- Under Construction
- Sector
- Government, Power Generation (CCGT)
- Location
- Democratic Republic of the Congo
- Updated
- 22 Jul 2026
- Source
- European Investment Bank (EIB)
ConstructChat
Ask ConstructChat about Inga Power Rehabilitation Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | signed |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | <span>The project consists of the rehabilitation of the existing Inga Power plants and associated transmission and distribution infrastructure in the Kinshasa region and Katanga. These will include inter alia the construction of a new transmission line between Inga and Kinshasa and the rehabilitation of 3 sub-stations in the Katanga region.</span> |
Original sector | Energy |
Location
Country | Democratic Republic of the Congo (DRC) |
Source
Source | European Investment Bank (EIB) |
URL |
More Details
Record type | Project |
Sector | Government, Power Generation (CCGT) |
Article published date | 2026-02-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
