logo

Initiative Rising Star School Buildings for Hopley / Ingenieure ohne Grenzen

Sector: Power Generation (CCGT) • Location: Zimbabwe

Source: ArchDaily

Project
Closed

The space between the ceiling and the roof makes ventilation possible. As a result, the solar radiation entering the building through the roof can be led back directly to this ventilation level by the air flowing through. The classrooms are not heated by direct sunlight. All details concerning the natural ventilation system are included in the choice of design.The construction system consists of 3

Project Information FAQ

Project Information

3 Q
The project “Initiative Rising Star School Buildings for Hopley / Ingenieure ohne Grenzen” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Zimbabwe. Taiyo aggregates data on it from ArchDaily.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The space between the ceiling and the roof makes ventilation possible. As a result, the solar radiation entering the building through the roof can be led back directly to this ventilation level by the air flowing through. The classrooms are not heated by direct sunlight. All details concerning the natural ventilation system are included in the choice of design.The construction system consists of 35cm thick walls. The classrooms are separated from the protected walkway by a steel-glass façade. To the outside, it shields itself with a solid brick wall. The openings inside the façade and the outer wall ensure natural cross ventilation. A double roof creates a comfortable climate in the classrooms.Text description provided by the architects.The Rising Star School in Hopley, a district ofHarare, forms a new center primarily for the children, but also for the adults of the community. Founded in 2010 and growing continuously, this primary school becomes a landmark in the vicinity of smaller residential building structures after the completion of the school building.The 14 classrooms are located in three single-story buildings. The kindergarten is on the ground floor, and the school administration is on the upper floor of the two-story part, which was completed at last. All classrooms and administration rooms have a pleasant indoor climate thanks to a natural ventilation system on the roof level so that nothing should stand in the way of successful learning and teaching.A special feature during the seven construction phases over the last seven years is the everyday coexistence: the children go already to a class of the previously completed phase, while the builders work on the next phase right next door. This cooperation shows not only mutual respect but also the acceptance of challenges and continuous support.It's hard to believe that the new school building is entirely handcrafted. Almost 600,000 bricks were laid by the bricklayers themselves, and only a few technical devices helped with the construction. There is no regulated and reliable water and electricity supply here. This is why the quiet construction site, from which Hopley's new center emerged almost imperceptibly, is no less impressive than the result. Details of connections and constructions are considered and optimized over the course of the seven-year construction period and finally result in the construction of the two-story part.The expressive appearance of the building through the massive, but - depending on the perspective - filigree architecture is characterized by round arches. The lessons take place under the arches and thus form a characteristic feature in the environment of the otherwise uniformly built Zimbabwean schools.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data