Innovation Lab HS Improvements Phase 3
Sector: Power Generation (CCGT) • Location: Bothell, Washington, United States of America
Source: Dodge USA
Scope - The Innovation Lab High School Phase 3 project s interior improvements include new casework in each of three (3) classrooms and minor electrical work. Exterior improvements include repair of existing exterior E.I.F.S facades, and removal of sealant around windows, storefront, fixtures, and doors. New sealant and associated work of areas mentioned, and areas noted on the drawings. New exter
- Status
- Closed
- Sector
- Power Generation (CCGT), Government, Commercial, Education
- Location
- Bothell, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Innovation Lab HS Improvements Phase 3
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Scope - The Innovation Lab High School Phase 3 project s interior improvements include new casework in each of three (3) classrooms and minor electrical work. Exterior improvements include repair of existing exterior E.I.F.S facades, and removal of sealant around windows, storefront, fixtures, and doors. New sealant and associated work of areas mentioned, and areas noted on the drawings. New exterior coating over all facades. Compressor replacement on a rooftop unit. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Bothell |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Government, Commercial, Education |
Article published date | 2024-03-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Shop 1 Building Replacement
- North Creek Trail Section 4-Phase 2 & 3
