Innovation Park Phase 1C
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
For furnishing all labor, materials, equipment, and performing all work necessary for the construction of the following approximate quantities: 100 LF of small diameter storm sewer; 60 LF of large diameter storm sewer, adjustment of existing utilities including valve manholes, 12,000 sf of concrete sidewalk, 150 LF of concrete curb and gutter, 1050 tons of asphaltic concrete pavement, 4,400 tons o
- Status
- Prospective
- Sector
- Water Supply and Storage, Commercial, Government, Cement, Car parking, Waste Processing and Treatment, Automotive, Road, Power Transmission, Power Generation (CCGT)
- Location
- Janesville, Wisconsin, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Innovation Park Phase 1C
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | For furnishing all labor, materials, equipment, and performing all work necessary for the construction of the following approximate quantities: 100 LF of small diameter storm sewer; 60 LF of large diameter storm sewer, adjustment of existing utilities including valve manholes, 12,000 sf of concrete sidewalk, 150 LF of concrete curb and gutter, 1050 tons of asphaltic concrete pavement, 4,400 tons of dense graded base, 2,500 CY of unclassified excavation and ditch grading, erosion control, new ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wisconsin |
City | Janesville |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Government, Cement, Car parking, Waste Processing and Treatment, Automotive, Road, Power Transmission, Power Generation (CCGT) |
Article published date | 2024-12-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
