Innovative Finance for Resilient and Sustainable Energy Transition
Sector: Solar • Location: Kyrgyz Republic
Source: World Bank Group
The Project has two interrelated components: (a) Payments for emission reductions (ERs) - Climate Finance and (b) Payments for Internationally Transferred Mitigation Outcomes (ITMOs) - Carbon Finance. Results-based payments would be made against the ERs measured, reported, and verified, which would result from more efficient energy use incentivized by energy subsidy reforms. The description of spe
- Status
- Prospective
- Sector
- Solar, Power Generation (CCGT), Wind, Government
- Location
- Kyrgyzstan
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Innovative Finance for Resilient and Sustainable Energy Transition
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | pipeline |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project has two interrelated components: (a) Payments for emission reductions (ERs) - Climate Finance and (b) Payments for Internationally Transferred Mitigation Outcomes (ITMOs) - Carbon Finance. Results-based payments would be made against the ERs measured, reported, and verified, which would result from more efficient energy use incentivized by energy subsidy reforms. The description of specific components is outlined in the following paragraphs.Component 1: Payments for measured, reported and verified emission reductions (ERs) - Climate Finance. This component encompasses the results-based payments under the Emission Reductions Payment Agreement (ERPA). ERs will be generated due to the change in end-user energy demand and energy intensity resulting from the gradual adjustment of electricity tariffs. Annual payments will be made based on the amount of ERs generated and contracted in the preceding year. The payments will reflect the volume and price outlined in the ERPA to be agreed between the Government of Kyrgyz Republic (GoKR) and TCAF contributors. The generated ERs under this component will remain in Kyrgyz Republic and will be used for the country’s NDC goals.This component directly supports Kyrgyz Republic's plans in both its NDC and Climate Change Strategy with respect to engaging international cooperation and mobilizing climate finance. In addition, the ERs and respective payments under this component would serve as a simulation of carbon trading, while all ERs would remain in Kyrgyz Republic and would not affect the country’s climate commitments under its updated NDC. Furthermore, it would pave the way for a real pilot carbon transaction under the Component 2, as outlined below.Component 2: Payments for measured, reported, and verified Internationally Transferred Mitigation Outcomes (ITMOs) – Carbon Finance. Similar to Component 1, payments would be made for measured, reported, and verified ERs resulting from energy tariff reforms under this Component. The key difference from Component 1 is that the ERs under Component 2 will be transferred out of Kyrgyz Republic and become ITMOs, i.e. Kyrgyz Republic will sell ERs and TCAF donor(s) (contributors) will buy the same.The underlying activity, measurement, reporting, and verification of ERs and payments schedule will be outlined in the Mitigation Outcomes Purchase Agreement (MOPA) to be signed between the World Bank with the GoKR. The underlying activity—the change in end user energy demand and energy intensity resulting from gradual adjustment in electricity tariffs—for this agreement is the same as for Component 1. The basis for payments under the MOPA is the authorization and international transfer of verified ERs by the GoKR, and accordingly payments will be made annually to the GoKR. Accordingly, under this Component, the GoKR will need to authorize and transfer a portion of ERs to TCAF for distribution to carbon market buyers. This will require the GoKR to undertake the necessary tracking, measuring and reporting as required by the Paris Agreement and the transferred portion of ERs will become ITMOs, which will not be used by Kyrgyz Republic for its NDC.Component 2 will therefore pilot an international carbon market transaction of Kyrgyz Republic under Article 6.2 of the Paris Agreement. This will require that Kyrgyz Republic comply with the accounting and reporting requirements of the Paris Agreement. The associated technical assistance will support Kyrgyz Republic’s Article 6 readiness efforts in line with its NDC commitments and relevant state programs outlined in the background section above.Technical Assistance (TA). This Project will be accompanied by a technical assistance with an estimated amount of up to US$1.5 million to be funded by TCAF and administered by the World Bank. The TA will play a critical role in developing the institutional capacity, systems and infrastructure for the GoKR stakeholders to fulfill its NDC goals and those outlined in relevant state programs toward the development of a state system of inventory, reporting, and control of GHG emissions. The TA also aims to support the GoKR in developing a robust MRV framework in compliance with Article 6 of the Paris Agreement. A draft Policy Implementation Support Plan (PISP) will be prepared by the GoKR toward that goal, which provides stepwise actions to prepare for Article 6 collaboration. It is structured around two main sections: (a) strategizing for Article 6 engagement, which explores high-level opportunities, risks, and conditions for such engagements and identifies key areas to be explored for an engagement strategy and (b) governing Article 6 collaboration, which explores the necessary governance and institutional frameworks that need to be developed to guide and implement Article 6 collaboration. |
Original sector | Energy and Mineral Resources,Social Protection |
Location
Country | Kyrgyzstan |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Solar, Power Generation (CCGT), Wind, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Solar projects in Kyrgyz Republic
- KyrSEFF III - DKIB Loan II
- KyrSEFF III - DKIB Loan III
- GrCF3 W1 - Bishkek District Heating
- Issyk-Kul Environmental Management and Sustainable Tourism Development Project
- Issyk-Kul Environmental Management and Sustainable Tourism Development Project
- Issyk-Kul Environmental Management and Sustainable Tourism Development Project
- Renewable Energy Development Project - Phase 2
