logo
ProjectEnded

Innovative Future-Proof Testing Methods for Reliable Critical Components in Wind Turbines

Ended · Spain, Finland, Belgium

Source: EU Funding & Tenders Portal

The future wind turbines will require flexible and economically affordable PDPs to obtain reliable and validated new concepts for bigger wind turbines or already installed turbines. One of the most critical components that have a high contribution to wind farms OpEx costs are the bearings (selected Case Studies 1 and 3 during INNTERESTING) and gearboxes (selected Case Study 2 during INNTERESTING

Status
Closed
Sector
Commercial, Wind
Location
Spain, Finland, Belgium
Updated
22 Jul 2026
Source
EU Funding & Tenders Portal

ConstructChat

Ask ConstructChat about Innovative Future-Proof Testing Methods for Reliable Critical Components in Wind Turbines

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Innovative Future-Proof Testing Methods for Reliable Critical Components in Wind Turbines” is an infrastructure initiative in the Commercial sector, located in Spain, Finland, Belgium. Taiyo aggregates data on it from EU Funding & Tenders Portal.

Participants

Not available for this record.

Status

Original status

ended

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The future wind turbines will require flexible and economically affordable PDPs to obtain reliable and validated new concepts for bigger wind turbines or already installed turbines. One of the most critical components that have a high contribution to wind farms OpEx costs are the bearings (selected Case Studies 1 and 3 during INNTERESTING) and gearboxes (selected Case Study 2 during INNTERESTING). Since both components transfer high loads and have high failure rates, they are considered as critical components inside the wind turbine. Although the percentage of the total Capex cost of bearings (2% ) is not as high as other structures (e.g. blades 22% and gearbox 13%) , their role is not insignificant.However, the role of bearings and gears in the OpEx is higher due to the major impact of early. The fatigue requirements that must be assured for the lifetime is a key factor to reduce the negative effect of reparations. New wind energy key concepts and uses which are faster to commercialisation have been prioritised: INNTERESTING project aims to accelerate wind energy technology development and increase lifetime extension of wind turbine components by developing a disruptive methodology to demonstrate reliability of larger wind turbine critical components without the need of building larger test-benches in the future by overcoming size dependent issues during design process and testing. In this matter, INNTERESTING project pursues the development of innovative virtual and hybrid testing methods for prototype validation of pitch bearing and gearboxes components (Selected Study Cases Components). The new methodology will help saving time and money during the product development process (PDP) by integrating virtual testing and hybrid testing: including innovative non-physical and scaled/simplified physical testing. In comparison with current methodologies INNTERESTING will reduce considerable environmental and economic impacts, and improve social acceptance.

Location

Country

Spain, Finland, Belgium

Source

Source

EU Funding & Tenders Portal

URL

More Details

Record type

Project

Sector

Commercial, Wind

Article published date

2026-02-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project