logo

Innovative groundwater and surface water management in the Southern Province of Zambia

Sector: Education • Location: Zambia

Source: KFW Bank aus Verantwortung

Project
Active

Rising temperatures, changes in the distribution of precipitation, decreasing amounts of precipitation and strong population growth associated with climate change are leading to a reduction in water availability, especially from surface water resources, in the southern province of Zambia. At the same time, the potential of existing groundwater resources in the intervention area is not being used s

Project Information FAQ

Project Information

5 Q
The project “Innovative groundwater and surface water management in the Southern Province of Zambia” is an infrastructure initiative in the Education sector, located in Zambia. Taiyo aggregates data on it from KFW Bank aus Verantwortung.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Rising temperatures, changes in the distribution of precipitation, decreasing amounts of precipitation and strong population growth associated with climate change are leading to a reduction in water availability, especially from surface water resources, in the southern province of Zambia. At the same time, the potential of existing groundwater resources in the intervention area is not being used sufficiently and inefficiently. Pollutant inputs and inadequate protection of existing well catchment areas endanger groundwater quality. There is no operational monitoring system for integrated water resource and demand planning at the water supplier level. Necessary measures to adapt to the consequences of climate change are therefore not possible. As a result of the points mentioned, the water supply security of the population of Choma is at risk (core problem). The following measures are being implemented to address the core problem: 1. Securing groundwater usage capacities in conjunction with increasing the share of groundwater in the overall supply, 2. Contribution to ensuring groundwater quality and protecting groundwater extraction wells and 3. Establishing an operational monitoring system for integrated water resource and demand planning and the associated management instruments. The aim of the measures is to make the water supply in the southern province of Zambia, particularly in the city of Choma, more resilient and to contribute to adaptation to climate change. The target group includes the entire population of Choma, in particular the poor population living in the peri-urban and adjacent rural areas who are severely affected by the consequences of climate change. The total costs of the project of EUR 10.0 million will be covered by a grant of the same amount. In addition, the executing agency will receive specific technical support through training and further education measures (including on-the-job training).

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data