logo

Inox Rajasthan 110MW Wind Project

Sector: Commercial • Location: India

Source: World Bank Group

Project
Active

Inox Wind Limited through its group subsidiary Gujarat Fluorochemicals Limited (GFL), entered into an agreement with Rajasthan Government, to develop 110MW wind power project at Barmer and Jaisalmer districts in the state of Rajasthan. The wind farm would involve the building of 55 wind turbines of INOX WT2000DF WEG of 2MW capacity each.The electricity generated from the project would be evacuated

Status
Prospective
Sector
Commercial, Power Generation (CCGT), Road, Raw Materials, Wind, Power Transmission, Government
Location
India
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Inox Rajasthan 110MW Wind Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Inox Rajasthan 110MW Wind Project” is an infrastructure initiative in the Commercial sector, located in India. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Inox Wind Limited through its group subsidiary Gujarat Fluorochemicals Limited (GFL), entered into an agreement with Rajasthan Government, to develop 110MW wind power project at Barmer and Jaisalmer districts in the state of Rajasthan. The wind farm would involve the building of 55 wind turbines of INOX WT2000DF WEG of 2MW capacity each.The electricity generated from the project would be evacuated by Northern, Eastern, Western and North Eastern (NEWNE) grid of India.The EPC for the power plant had been awarded to Inox Wind Limited (IWL). IWL would develop,construct,commission operate and maintain the project at an all-inclusive price. Gujarat Fluorochemicals Limited had already approached Rajasthan Urja Vikas Nigam Limited (Rajasthan Discom )- for entering into Power Purchase Agreement. The APPC (Average Power Purchase Cost) 25-year base feed-in tariff as per RERC (Rajasthan State Regulator) tariff order, was US$ 0.083/Unit (INR 4.46 per unit @ 53.44INR/USD). The transmission charges would be paid by GFL to the state transmission utility. The total capacity of 100MW was eligible for CDM benefits and the company had initiated the process with UNFCC. Details of financial closure or project cost were not available. As per company sources, the project was already commissioned in August 2012.

Original sector

Energy

Location

Country

India

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Commercial, Power Generation (CCGT), Road, Raw Materials, Wind, Power Transmission, Government

Article published date

2024-09-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project