Inox Rajasthan 110MW Wind Project
Sector: Government • Location: India
Source: World Bank Group
Inox Wind Limited through its group subsidiary Gujarat Fluorochemicals Limited (GFL), entered into an agreement with Rajasthan Government, to develop 110MW wind power project at Barmer and Jaisalmer districts in the state of Rajasthan. The wind farm would involve the building of 55 wind turbines of INOX WT2000DF WEG of 2MW capacity each.The electricity generated from the project would be evacuated
- Status
- Prospective
- Sector
- Government, Road, Raw Materials, Wind, Power Transmission, Power Generation (CCGT), Commercial
- Location
- India
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Inox Rajasthan 110MW Wind Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Inox Wind Limited through its group subsidiary Gujarat Fluorochemicals Limited (GFL), entered into an agreement with Rajasthan Government, to develop 110MW wind power project at Barmer and Jaisalmer districts in the state of Rajasthan. The wind farm would involve the building of 55 wind turbines of INOX WT2000DF WEG of 2MW capacity each.The electricity generated from the project would be evacuated by Northern, Eastern, Western and North Eastern (NEWNE) grid of India.The EPC for the power plant had been awarded to Inox Wind Limited (IWL). IWL would develop,construct,commission operate and maintain the project at an all-inclusive price. Gujarat Fluorochemicals Limited had already approached Rajasthan Urja Vikas Nigam Limited (Rajasthan Discom )- for entering into Power Purchase Agreement. The APPC (Average Power Purchase Cost) 25-year base feed-in tariff as per RERC (Rajasthan State Regulator) tariff order, was US$ 0.083/Unit (INR 4.46 per unit @ 53.44INR/USD). The transmission charges would be paid by GFL to the state transmission utility. The total capacity of 100MW was eligible for CDM benefits and the company had initiated the process with UNFCC. Details of financial closure or project cost were not available. As per company sources, the project was already commissioned in August 2012. |
Original sector | Energy |
Location
Country | India |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Government, Road, Raw Materials, Wind, Power Transmission, Power Generation (CCGT), Commercial |
Article published date | 2024-09-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project