logo

Inspection and Repair Plan for Alverno, Tower, and Kleber Dams

The owner, status and timeline of this project. A free account opens every field.

Source: Bridge Michigan

Project
Under Inspection

Federal Energy Regulatory Commission ordered Black River Hydro, owners of the Alverno, Tower, and Kleber dams upstream from Cheboygan, to conduct inspections following high water events. Concerns include lack of engineers on-site during flooding, leaking at the Kleber weir, and erosion requiring emergency riprap at Alverno. Black River Hydro has 15 days to complete inspections and report back with

Status
Under Construction
Sector
Water Supply and Storage, Hydro, Power Generation (CCGT), Bridge
Location
Michigan, United States of America
Updated
22 Jul 2026
Source
Bridge Michigan

ConstructChat

Ask ConstructChat about Inspection and Repair Plan for Alverno, Tower, and Kleber Dams

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Inspection and Repair Plan for Alverno, Tower, and Kleber Dams” is an infrastructure initiative in the Water Supply and Storage sector, located in Michigan, United States. Taiyo aggregates data on it from Bridge Michigan.

Participants

Not available for this record.

Status

Original status

under inspection

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Federal Energy Regulatory Commission ordered Black River Hydro, owners of the Alverno, Tower, and Kleber dams upstream from Cheboygan, to conduct inspections following high water events. Concerns include lack of engineers on-site during flooding, leaking at the Kleber weir, and erosion requiring emergency riprap at Alverno. Black River Hydro has 15 days to complete inspections and report back with a repair plan.

Original sector

Energy

Location

Country

United States of America (USA)

State

Michigan

Source

Source

Bridge Michigan

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Hydro, Power Generation (CCGT), Bridge

Article published date

2026-05-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project