Install six new watermain valves and rehabilitate two watermain valves within the Drayton water distribution system to address system deficiencies and improve operational flexibility
One of 10,000+ projects Taiyo tracks in Ontario.
Source: Infrastructure Canada
Installation of six new watermain valves and replacement of two (2) watermain valves within the Drayton water distribution system to address system deficiencies and improve operational flexibility. The six (6) new watermain valves will be installed at the 1) & 2) east and west side of the watermain on Wood Street where the watermain connects to the pump house and treatment facility; 3) Located on
- Status
- Closed
- Sector
- Water Supply and Storage, Road, Government
- Location
- Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Install six new watermain valves and rehabilitate two watermain valves within the Drayton water distribution system to address system deficiencies and improve operational flexibility
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Installation of six new watermain valves and replacement of two (2) watermain valves within the Drayton water distribution system to address system deficiencies and improve operational flexibility. The six (6) new watermain valves will be installed at the 1) & 2) east and west side of the watermain on Wood Street where the watermain connects to the pump house and treatment facility; 3) Located on Mill Street on the 250 mm diameter watermain located on the Mill Street extension of the watermain that runs under the Conestoga River just west of the intersection of Mill Street and River Run Road; 4) Intersection of Wood and John Street on the 150 mm diameter watermain on the north leg of the connection between the Wood Street and John Street watermains; 5) Intersection of Union Street and Smith Drive on the 150 mm diameter watermain on the east leg of the connection between the Union Street and Smith Drive watermains; 6) Intersection of Union Street and Spring Street on the 150 mm diameter watermain on the west leg of the connection between the Union Street and Spring Street watermain. The two (2) replacement valves are located at: 1) Intersection of Wood and John Street on the 250 mm diameter watermain on the west leg of the connection between the Wood Street and John Street watermains; 2) Intersection of Union Street and Main Street on the 150 mm diameter watermain on the south leg of the connection between the Union Street and Main Street watermains |
Original sector | Drinking Water and Wastewater |
Location
Country | Canada |
State | Ontario |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Government |
Article published date | 2026-02-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
