logo

Install six new watermain valves and rehabilitate two watermain valves within the Drayton water distribution system to address system deficiencies and improve operational flexibility

Sector: Water Supply and Storage • Location: Ontario, Canada

Source: Infrastructure Canada

Project
Completed

Installation of six new watermain valves and replacement of two (2) watermain valves within the Drayton water distribution system to address system deficiencies and improve operational flexibility. The six (6) new watermain valves will be installed at the 1) & 2) east and west side of the watermain on Wood Street where the watermain connects to the pump house and treatment facility; 3) Located on

Status
Closed
Sector
Water Supply and Storage, Road, Government, Manufacturing (Industrial)
Location
Ontario, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Install six new watermain valves and rehabilitate two watermain valves within the Drayton water distribution system to address system deficiencies and improve operational flexibility

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Install six new watermain valves and rehabilitate two watermain valves within the Drayton water distribution system to address system deficiencies and improve operational flexibility” is an infrastructure initiative in the Water Supply and Storage sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Installation of six new watermain valves and replacement of two (2) watermain valves within the Drayton water distribution system to address system deficiencies and improve operational flexibility. The six (6) new watermain valves will be installed at the 1) & 2) east and west side of the watermain on Wood Street where the watermain connects to the pump house and treatment facility; 3) Located on Mill Street on the 250 mm diameter watermain located on the Mill Street extension of the watermain that runs under the Conestoga River just west of the intersection of Mill Street and River Run Road; 4) Intersection of Wood and John Street on the 150 mm diameter watermain on the north leg of the connection between the Wood Street and John Street watermains; 5) Intersection of Union Street and Smith Drive on the 150 mm diameter watermain on the east leg of the connection between the Union Street and Smith Drive watermains; 6) Intersection of Union Street and Spring Street on the 150 mm diameter watermain on the west leg of the connection between the Union Street and Spring Street watermain. The two (2) replacement valves are located at: 1) Intersection of Wood and John Street on the 250 mm diameter watermain on the west leg of the connection between the Wood Street and John Street watermains; 2) Intersection of Union Street and Main Street on the 150 mm diameter watermain on the south leg of the connection between the Union Street and Main Street watermains

Original sector

Drinking Water and Wastewater

Location

Country

Canada

State

Ontario

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Road, Government, Manufacturing (Industrial)

Article published date

2025-10-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project