Installed adVAnced Nacelle uHbr Optimisation and Evaluation
Sector: Aerospace & Defense • Location: Sweden, Netherlands, Germany, Italy
Source: EU Funding & Tenders Portal
The introduction of UHBR engines poses new challenges on optimal nacelle design, both in geometry and in location. In response to the topic CfP09 CS2-LPA-01-67, the IVANHOE project will address this challenge, resulting in a new multi-fidelity optimisation method, validated by advanced wind tunnel experiments. A consortium of an SME, an industry, an R&D institute and 3 universities with complement
- Status
- Closed
- Sector
- Aerospace & Defense, Tunnel, Wind, Airport, Education
- Location
- Sweden, Netherlands, Germany, Italy
- Updated
- 22 Jul 2026
- Source
- EU Funding & Tenders Portal
ConstructChat
Ask ConstructChat about Installed adVAnced Nacelle uHbr Optimisation and Evaluation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | ended |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The introduction of UHBR engines poses new challenges on optimal nacelle design, both in geometry and in location. In response to the topic CfP09 CS2-LPA-01-67, the IVANHOE project will address this challenge, resulting in a new multi-fidelity optimisation method, validated by advanced wind tunnel experiments. A consortium of an SME, an industry, an R&D institute and 3 universities with complementary skills will produce this result in close coordination with the topic manager in 36 months, asking for a grant of € 3 514 834. Coordinator CTH will provide the design envelope and safeguard thrust/drag performance, HIT09 and UNIPD will jointly optimise a rapid design loop to down select options. TUB will validate the resulting design options with a high fidelity CFD code, complemented by a high fidelity wind tunnel experiment of a Deharde powered nacelle model in DNW’s High Speed Tunnel. The project will advance the state of the art in nacelle design by smart use of various fidelity level aerodynamic modelling tools enabling fast iterations and down selection of nacelle geometries and locations. Wing/nacelle interference will be taken into account. This method will be validated by wind tunnel experiments with new and advanced wind tunnel model and measuring techniques. The result of the nacelle optimisation for an UHBR installation on the Common Research Model will be delivered in full compliance with the call. Moreover, IVANHOE’s will provide an improved design method, tools and facilities for use by the European aviation industry for future aircraft projects, unlocking the full potential of CO2 reduction of UHBR engines while increasing competitiveness by reducing costs for design and testing. |
Location
Country | Sweden, Netherlands, Germany, Italy |
Source
Source | EU Funding & Tenders Portal |
URL |
More Details
Record type | Project |
Sector | Aerospace & Defense, Tunnel, Wind, Airport, Education |
Article published date | 2026-02-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
