logo
ProjectEnded

Installed adVAnced Nacelle uHbr Optimisation and Evaluation

Sector: Aerospace & Defense • Location: Sweden, Netherlands, Germany, Italy

Source: EU Funding & Tenders Portal

The introduction of UHBR engines poses new challenges on optimal nacelle design, both in geometry and in location. In response to the topic CfP09 CS2-LPA-01-67, the IVANHOE project will address this challenge, resulting in a new multi-fidelity optimisation method, validated by advanced wind tunnel experiments. A consortium of an SME, an industry, an R&D institute and 3 universities with complement

Status
Closed
Sector
Aerospace & Defense, Tunnel, Wind, Airport, Education
Location
Sweden, Netherlands, Germany, Italy
Updated
22 Jul 2026
Source
EU Funding & Tenders Portal

ConstructChat

Ask ConstructChat about Installed adVAnced Nacelle uHbr Optimisation and Evaluation

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Installed adVAnced Nacelle uHbr Optimisation and Evaluation” is an infrastructure initiative in the Aerospace & Defense sector, located in Sweden, Netherlands, Germany, Italy. Taiyo aggregates data on it from EU Funding & Tenders Portal.

Participants

Not available for this record.

Status

Original status

ended

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The introduction of UHBR engines poses new challenges on optimal nacelle design, both in geometry and in location. In response to the topic CfP09 CS2-LPA-01-67, the IVANHOE project will address this challenge, resulting in a new multi-fidelity optimisation method, validated by advanced wind tunnel experiments. A consortium of an SME, an industry, an R&D institute and 3 universities with complementary skills will produce this result in close coordination with the topic manager in 36 months, asking for a grant of € 3 514 834. Coordinator CTH will provide the design envelope and safeguard thrust/drag performance, HIT09 and UNIPD will jointly optimise a rapid design loop to down select options. TUB will validate the resulting design options with a high fidelity CFD code, complemented by a high fidelity wind tunnel experiment of a Deharde powered nacelle model in DNW’s High Speed Tunnel. The project will advance the state of the art in nacelle design by smart use of various fidelity level aerodynamic modelling tools enabling fast iterations and down selection of nacelle geometries and locations. Wing/nacelle interference will be taken into account. This method will be validated by wind tunnel experiments with new and advanced wind tunnel model and measuring techniques. The result of the nacelle optimisation for an UHBR installation on the Common Research Model will be delivered in full compliance with the call. Moreover, IVANHOE’s will provide an improved design method, tools and facilities for use by the European aviation industry for future aircraft projects, unlocking the full potential of CO2 reduction of UHBR engines while increasing competitiveness by reducing costs for design and testing.

Location

Country

Sweden, Netherlands, Germany, Italy

Source

Source

EU Funding & Tenders Portal

URL

More Details

Record type

Project

Sector

Aerospace & Defense, Tunnel, Wind, Airport, Education

Article published date

2026-02-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project