logo

Institutional Roads 2025 Reconstruction

Sector: Water Supply and Storage • Location: Ames, Iowa, United States of America

Source: Dodge USA

Project
Closed

This project includes reconstruction of Stange Road from 13th Street to Blankenburg Drive. Work includes, but is not limited to, site clearing and grubbing, pavement removal, grading, subgrade preparation, installation of approximately 208 LF storm sewer pipe and 14 intakes, 3,748 LF of subdrain, 9,677 SY of 8 inch PCC pavement, 616 SY of 10 inch PCC pavement (bridge approach) and 4,184 SY of 6 in

Status
Closed
Sector
Water Supply and Storage, Bridge, Road, Commercial, Car parking, Waste Processing and Treatment, Automotive
Location
Ames, Iowa, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Institutional Roads 2025 Reconstruction

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Institutional Roads 2025 Reconstruction” is an infrastructure initiative in the Water Supply and Storage sector, located in Ames, Iowa, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project includes reconstruction of Stange Road from 13th Street to Blankenburg Drive. Work includes, but is not limited to, site clearing and grubbing, pavement removal, grading, subgrade preparation, installation of approximately 208 LF storm sewer pipe and 14 intakes, 3,748 LF of subdrain, 9,677 SY of 8 inch PCC pavement, 616 SY of 10 inch PCC pavement (bridge approach) and 4,184 SY of 6 inch PCC sidewalk pavement, pavement markings, lighting and surface restoration.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Iowa

City

Ames

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Bridge, Road, Commercial, Car parking, Waste Processing and Treatment, Automotive

Article published date

2024-11-11

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project