Institutional Roads 2025 Reconstruction
Sector: Water Supply and Storage • Location: Ames, Iowa, United States of America
Source: Dodge USA
This project includes reconstruction of Stange Road from 13th Street to Blankenburg Drive. Work includes, but is not limited to, site clearing and grubbing, pavement removal, grading, subgrade preparation, installation of approximately 208 LF storm sewer pipe and 14 intakes, 3,748 LF of subdrain, 9,677 SY of 8 inch PCC pavement, 616 SY of 10 inch PCC pavement (bridge approach) and 4,184 SY of 6 in
- Status
- Closed
- Sector
- Water Supply and Storage, Bridge, Road, Commercial, Car parking, Waste Processing and Treatment, Automotive
- Location
- Ames, Iowa, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Institutional Roads 2025 Reconstruction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project includes reconstruction of Stange Road from 13th Street to Blankenburg Drive. Work includes, but is not limited to, site clearing and grubbing, pavement removal, grading, subgrade preparation, installation of approximately 208 LF storm sewer pipe and 14 intakes, 3,748 LF of subdrain, 9,677 SY of 8 inch PCC pavement, 616 SY of 10 inch PCC pavement (bridge approach) and 4,184 SY of 6 inch PCC sidewalk pavement, pavement markings, lighting and surface restoration. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Iowa |
City | Ames |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Bridge, Road, Commercial, Car parking, Waste Processing and Treatment, Automotive |
Article published date | 2024-11-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
