Intake 3 Project
Completed · Nevada · Last reported Apr 2025
Source: We Build Value
The Intake 3 project at Lake Mead involves the construction of a 4-kilometer-long hydraulic tunnel that draws potable water from the bottom of the lake, ensuring water supply to Las Vegas even during drought periods.
- Status
- Closed
- Sector
- Tunnel, Water Supply and Storage
- Location
- Nevada, United States of America
- Updated
- 22 Jul 2026
- Source
- We Build Value
ConstructChat
Ask ConstructChat about Intake 3 Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | Completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Intake 3 project at Lake Mead involves the construction of a 4-kilometer-long hydraulic tunnel that draws potable water from the bottom of the lake, ensuring water supply to Las Vegas even during drought periods. |
Original sector | Water |
Location
Country | United States of America (USA) |
State | Nevada |
Source
Source | We Build Value |
URL |
More Details
Record type | Project |
Sector | Tunnel, Water Supply and Storage |
Article published date | 2025-04-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
