Int.Cent.Insect Physiology/Ecology-Icip
The status, timeline and source of this project. A free account opens every field.
Source: African Development Bank (AfDB)
An amount of UA 300000 million has been allocated to ICIPE institution for a maximum of three-year period. The capacity of the institution to carry out the activities set out in the application i.e. the qualification of the researchers, originality of the research and existence of infrastructure for the research was taken in to consideration together with other important criteria. In order for the
- Sector
- Raw Materials, Government
- Location
- World
- Updated
- 22 Jul 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about Int.Cent.Insect Physiology/Ecology-Icip
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | An amount of UA 300000 million has been allocated to ICIPE institution for a maximum of three-year period. The capacity of the institution to carry out the activities set out in the application i.e. the qualification of the researchers, originality of the research and existence of infrastructure for the research was taken in to consideration together with other important criteria. In order for the ADF/TAF funds to be disbursed, each beneficiary institution will, before disbursement, enter into a protocol of agreement with the ADF. The agreement will stipulate the following conditions: i) The grant shall be used only in support of the activities of the beneficiary institution for which the funds have been provided; ii) The beneficiary institution will submit comprehensive scientific progress reports on its work every six months, audited financial statements annually, as well as a completion report on the utilisation of the ADF/TAF grant; and iii) The beneficiary institution undertakes to provide any required information relevant to its activities, to recieve Bank staff field missions and to meet with them as often as necessary for program follow-up and review of performance. |
Original sector | Agriculture, Forestry, Fishing |
Budget |
Location
Country | World |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Project |
Sector | Raw Materials, Government |
Article published date | 2025-03-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Raw Materials projects in Multinational
- Multinational - Integrated Programme for Development and Adaptation to Climate Change in the Basin of Niger (PIDACC)
- Multinational Tanzania/ Rwanda - Feasibility Study of the Isaka-Kigali Railway Project
- Multinational - Sustainable Management of Endemic Ruminant Livestock in West Africa
- Multinational- Ruzizi III regional hydropower plant project (Rwanda)
- Democratic Republic of Congo - Geographically-Integrated ECOMAKALA+ REDD Pilot Project
- PROJET DE GESTION DURABLE DU BETAIL RUMINANT ENDEMIQUE EN AFRIQUE DE L'OUEST(SENEGAL)
- Multinational - Development of forest byproducts and reforestation of degraded areas in central Africa
- Multinational - Sixth Line of Credit to East African Development Bank (EADB)
