INTDEM 100 Summer ST
Open · Massachusetts
Source: City of Boston
2nd floor(Suite 250)-Removal all flooring within the suite, remove selected perimeter and interior offices, patch in ceilings as needed at removed offices, relocate existing sprinkler heads to maintain code compliant coverage, paint all remaining partitions, replace selected light fixtures, skim all areas where flooring was removed, and replace the existing tenant entry with new.
- Status
- Prospective
- Sector
- Commercial, Government
- Location
- Boston, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about INTDEM 100 Summer ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | 2nd floor(Suite 250)-Removal all flooring within the suite, remove selected perimeter and interior offices, patch in ceilings as needed at removed offices, relocate existing sprinkler heads to maintain code compliant coverage, paint all remaining partitions, replace selected light fixtures, skim all areas where flooring was removed, and replace the existing tenant entry with new. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Boston |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
