INTDEM 21 Ridgeway LN
Sector: Cement • Location: Boston, Massachusetts, United States of America
Source: City of Boston
;Proposed work includes removal of portion of brick wall beneath pipe chase, investigate extent of impacted soil behind wall, repair brick wall with like brick and mortar, backfill and compact soil behind wall as wall is built, dispose of impacted soil and brick, as needed. Limited removal concrete floor and contaminated soil.
- Status
- Prospective
- Sector
- Cement, Commercial, Government
- Location
- Boston, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about INTDEM 21 Ridgeway LN
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | ;Proposed work includes removal of portion of brick wall beneath pipe chase, investigate extent of impacted soil behind wall, repair brick wall with like brick and mortar, backfill and compact soil behind wall as wall is built, dispose of impacted soil and brick, as needed. Limited removal concrete floor and contaminated soil. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Boston |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Cement, Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
