INTDEM 36 Green ST
The status, timeline and source of this project. A free account opens every field.
Source: City of Boston
Remove all Wall, ceiling and flooring leaving all main wall studs and structural in place. Remove basement concrete floor and dig for perimeter drain in conjunction with ALT660351
Do Not Remove the Lic. Builder as the primary contact.; Michael Halley
- Status
- Prospective
- Sector
- Cement, Commercial, Government, Waste Processing and Treatment
- Location
- Charlestown, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about INTDEM 36 Green ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Remove all Wall, ceiling and flooring leaving all main wall studs and structural in place. Remove basement concrete floor and dig for perimeter drain in conjunction with ALT660351 Do Not Remove the Lic. Builder as the primary contact.; Michael Halley |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Charlestown |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Cement, Commercial, Government, Waste Processing and Treatment |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
