Integrate and upgrade the communication and data management systems at the water and wastewater plants.
Sector: Water Supply and Storage • Location: Ontario, Canada
Source: Infrastructure Canada
Replacing the current water plant Programmable Logic Controller (PLC) with a model that meets the current industry standard. This would include a new Human Machine Interface (HMI) along with other control features and redundant systems to support the operational process and which could function as standalone from the connected remote Supervisory Control and Data Acquisition computer (SCADA) at the
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Government
- Location
- Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Integrate and upgrade the communication and data management systems at the water and wastewater plants.
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Replacing the current water plant Programmable Logic Controller (PLC) with a model that meets the current industry standard. This would include a new Human Machine Interface (HMI) along with other control features and redundant systems to support the operational process and which could function as standalone from the connected remote Supervisory Control and Data Acquisition computer (SCADA) at the sewage plant. Replacing the existing communication equipment to allow communications to the sewage plant. Adding in new communications equipment at the sewage plant to receive the information from the water plant. Integrate the existing Supervisory Control and Data Acquisition at the sewage plant with all the telemetry from the water plant to allow operations staff to observe and control the water system process from the sewage plant. Program the Supervisory Control and Data Acquisition by adding improved interlocks and alarming along with data reporting for the drinking water system. |
Original sector | Drinking Water and Wastewater |
Budget |
Location
Country | Canada |
State | Ontario |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Government |
Article published date | 2025-06-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
