logo

Integrate and upgrade the communication and data management systems at the water and wastewater plants.

Sector: Water Supply and Storage • Location: Ontario, Canada

Source: Infrastructure Canada

Project
Completed

Replacing the current water plant Programmable Logic Controller (PLC) with a model that meets the current industry standard. This would include a new Human Machine Interface (HMI) along with other control features and redundant systems to support the operational process and which could function as standalone from the connected remote Supervisory Control and Data Acquisition computer (SCADA) at the

Status
Closed
Sector
Water Supply and Storage, Waste Processing and Treatment, Government
Location
Ontario, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Integrate and upgrade the communication and data management systems at the water and wastewater plants.

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Integrate and upgrade the communication and data management systems at the water and wastewater plants.” is an infrastructure initiative in the Water Supply and Storage sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Replacing the current water plant Programmable Logic Controller (PLC) with a model that meets the current industry standard. This would include a new Human Machine Interface (HMI) along with other control features and redundant systems to support the operational process and which could function as standalone from the connected remote Supervisory Control and Data Acquisition computer (SCADA) at the sewage plant. • Replacing the existing communication equipment to allow communications to the sewage plant. • Adding in new communications equipment at the sewage plant to receive the information from the water plant. • Integrate the existing Supervisory Control and Data Acquisition at the sewage plant with all the telemetry from the water plant to allow operations staff to observe and control the water system process from the sewage plant. • Program the Supervisory Control and Data Acquisition by adding improved interlocks and alarming along with data reporting for the drinking water system.

Original sector

Drinking Water and Wastewater

Budget

Location

Country

Canada

State

Ontario

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Waste Processing and Treatment, Government

Article published date

2025-06-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project