Integrate and upgrade the communication and data management systems at the water and wastewater plants.
The status, timeline and source of this project. A free account opens every field.
Source: Infrastructure Canada
Replacing the current water plant Programmable Logic Controller (PLC) with a model that meets the current industry standard. This would include a new Human Machine Interface (HMI) along with other control features and redundant systems to support the operational process and which could function as standalone from the connected remote Supervisory Control and Data Acquisition computer (SCADA) at the
- Status
- Closed
- Sector
- Waste Processing and Treatment, Water Supply and Storage
- Location
- Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Integrate and upgrade the communication and data management systems at the water and wastewater plants.
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Replacing the current water plant Programmable Logic Controller (PLC) with a model that meets the current industry standard. This would include a new Human Machine Interface (HMI) along with other control features and redundant systems to support the operational process and which could function as standalone from the connected remote Supervisory Control and Data Acquisition computer (SCADA) at the sewage plant. Replacing the existing communication equipment to allow communications to the sewage plant. Adding in new communications equipment at the sewage plant to receive the information from the water plant. Integrate the existing Supervisory Control and Data Acquisition at the sewage plant with all the telemetry from the water plant to allow operations staff to observe and control the water system process from the sewage plant. Program the Supervisory Control and Data Acquisition by adding improved interlocks and alarming along with data reporting for the drinking water system. |
Original sector | Drinking Water and Wastewater |
Location
Country | Canada |
State | Ontario |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage |
Article published date | 2026-05-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in Canada
- Highway Rehab -- Bridge replacement Holland Drainage Canal, Bradford-West Gwillimbury
- Highway Rehab -- Resurfacing, Culvert rehabilitation, Drainage improvements Haldimand Rd. 56 to Dunnville west limits, and east limit of Dunnville to West/Central Boundary Haldimand County
- Highway Rehab -- Culvert rehabilitation Morris Drain Culvert, Lambton County
- Kirby In-Situ Oilsands Steam Assisted Gravity Drainage Buildings
- Southeast Personal Care Home
- Stonewall Woodlands Regional Water Supply
- Wastewater Lagoon Upgrades
- Russell Lagoon Upgrade
