Integrated Budour — Northeast Birba Gas Processing Project
Sector: Oil and Gas • Location: Oman
Source: Upstream Online
ENPPI has secured a $355 million contract from Petroleum Development Oman (PDO) for the integrated Budour — Northeast Birba project. The project aims to boost gas processing capacity at PDO’s Birba gas gathering station from 1.4 million to 4.2 million cubic metres per day, while maintaining oil processing at 4000 cubic metres per day. The scope includes engineering design, procurement, constructio
- Status
- Closed
- Sector
- Oil and Gas
- Location
- Oman
- Updated
- 22 Jul 2026
- Source
- Upstream Online
ConstructChat
Ask ConstructChat about Integrated Budour — Northeast Birba Gas Processing Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | ENPPI has secured a $355 million contract from Petroleum Development Oman (PDO) for the integrated Budour — Northeast Birba project. The project aims to boost gas processing capacity at PDO’s Birba gas gathering station from 1.4 million to 4.2 million cubic metres per day, while maintaining oil processing at 4000 cubic metres per day. The scope includes engineering design, procurement, construction, pre-commissioning, commissioning, start-up, and six months of initial operational support after provisional acceptance. It also involves upgrading gas processing and utilisation systems to enhance operational efficiency and reduce gas flaring to minimal levels, supporting PDO’s environmental goals to eliminate routine flaring by 2030. |
Original sector | Energy |
Budget |
Location
Country | Oman |
Source
Source | Upstream Online |
URL |
More Details
Record type | Project |
Sector | Oil and Gas |
Article published date | 2026-05-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Oil and Gas projects in Oman
- Ibri Independent Power Project
- Ras Markaz Crude Oil Storage Terminal
- Salalah Liquefied Petroleum Gas Project, Dhofar
- Qalhat LNG Plant (Liquid Natural Gas Project), Oman
- Khazzan Gas Field, Ad Dhahirah Governorate
- Musandam Independent Power Project IPP
- Miraah Solar Thermal Project
- Sohar Refinery, Wilayat of Sohar
