Integrated Drug Prevention Pilot Project
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
The Integrated Drug Prevention Pilot Project seeks to test the applicability of a multisectoral drug prevention strategy in the Argentine context. There are three project components. 1) Participatory approaches to drug prevention will promote local solutions to drug use in selected municipalities on a pilot basis via training local community members and sector professionals; training youth leaders
- Status
- Closed
- Sector
- Government
- Location
- Argentina
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Integrated Drug Prevention Pilot Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Integrated Drug Prevention Pilot Project seeks to test the applicability of a multisectoral drug prevention strategy in the Argentine context. There are three project components. 1) Participatory approaches to drug prevention will promote local solutions to drug use in selected municipalities on a pilot basis via training local community members and sector professionals; training youth leaders; and financing the implementation of the municipal plans for drug prevention. 2) Information systems, monitoring, and evaluation will establish the network to facilitate generation and exchange of information relevant to drug prevention, as well as to carry out the monitoring and evaluation of the project by means of a) a survey-based epidemiological study to obtain information on drug consumption patterns; b) development of prevention methods and training modules that will be disseminated via national, regional, and provincial workshops; c) creation of a network of monitoring centers to strengthen existing institutions focused on drug prevention; and d) monitoring and evaluation of overall project implementation processes. 3) Project management will set up a project implementation unit. |
Original sector | FY17 - Public Administration,FY17 - Social Protection |
Budget |
Location
Country | Argentina |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
