logo
ProjectEnded

Integrated Planning of Multi-Energy Systems

Sector: Power Generation (CCGT) • Location: Germany, Italy, Türkiye

Source: EU Funding & Tenders Portal

The general objective of the project is the development of an integrated planning tool for multi-energy systems on a European scale. To reach the COP21 goals concerning a stepwise reduction of energy-related greenhouse gas (GHG) emissions in a cost effective way, the decarbonisation of multiple energy sectors is necessary. Therefore, the model considers the coupling of different energy sectors (el

Status
Closed
Sector
Power Generation (CCGT), Electric Vehicles (EVs), Automotive, Government
Location
Germany, Italy, Türkiye
Updated
22 Jul 2026
Source
EU Funding & Tenders Portal

ConstructChat

Ask ConstructChat about Integrated Planning of Multi-Energy Systems

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Integrated Planning of Multi-Energy Systems” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Germany, Italy, Türkiye. Taiyo aggregates data on it from EU Funding & Tenders Portal.

Participants

Sponsoring Agency

Status

Original status

ended

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The general objective of the project is the development of an integrated planning tool for multi-energy systems on a European scale. To reach the COP21 goals concerning a stepwise reduction of energy-related greenhouse gas (GHG) emissions in a cost effective way, the decarbonisation of multiple energy sectors is necessary. Therefore, the model considers the coupling of different energy sectors (electricity, heat, mobility and gas) and calculates the cost-optimal energy mix for the future European energy system (e. g. up to 2050) that is compliant with the climate goals. Besides generation and storage systems, also transmission and distribution grids are considered in the planning and operation stage in an integrated way. These modeling requirements lead to both a large mixed-integer (non-linear) optimization problem and new solution methods that will be developed within the course of the project. This will be achieved by solving both mathematical and computational challenges in the field of energy system modeling. Thereby, novel mathematical formulations of energy system modeling problems will be proposed, e. g. by combining diverse mathematical decomposition methods. The goal is to strive towards a system, where a multiplicity of models for single energy system aspects all synergistically contribute to the optimal planning of such a complex system. The project will provide a new energy system planning tool for different stakeholders of the energy system, which promotes optimal development and operation of the system. This includes European system planners, regulators and national authorities as well as technology companies, grid operators and utilities. To ensure the applicability of the developed tools, an advisory board will review the intermediate and final results of the project. Finally, two case studies with European scope will be performed to show the adequacy and relevance of the developed modelling framework.

Location

Country

Germany, Italy, Türkiye

Source

Source

EU Funding & Tenders Portal

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Electric Vehicles (EVs), Automotive, Government

Article published date

2026-02-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project