Integrated Resource Plan (IRP) 2024
Sector: Power Generation (CCGT) • Location: Bedfordview, Gauteng, South Africa
Source: Engineering News
The new Integrated Resource Plan (IRP) is set to include a 10-year delay to the shutdown of certain coal-fired power stations, as indicated by Electricity and Energy Minister Dr. Kgosientsho Ramokgopa. This decision is based on socioeconomic impact assessments and security-of-supply studies, aiming to ensure electricity security while considering the economic fallout for regions dependent on coal.
- Status
- Prospective
- Sector
- Power Generation (CCGT), Government
- Location
- Bedfordview, Gauteng, South Africa
- Updated
- 22 Jul 2026
- Source
- Engineering News
ConstructChat
Ask ConstructChat about Integrated Resource Plan (IRP) 2024
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The new Integrated Resource Plan (IRP) is set to include a 10-year delay to the shutdown of certain coal-fired power stations, as indicated by Electricity and Energy Minister Dr. Kgosientsho Ramokgopa. This decision is based on socioeconomic impact assessments and security-of-supply studies, aiming to ensure electricity security while considering the economic fallout for regions dependent on coal. |
Original sector | Electricity |
Location
Country | South Africa |
State | Gauteng |
City | Bedfordview |
Source
Source | Engineering News |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Government |
Article published date | 2025-02-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
