logo

Integrated restoration of priority river basins in Mexico

Sector: Water Supply and Storage • Location: Mexico

Source: Inter-American Development Bank (IADB)

Project
Preparation

The general objective of this TC is to develop a science-based implementation strategy to restore ecological quality and climate resilience in priority micro-basins. By leveraging the HydroBID suite to create a calibrated hydrological framework, the TC will optimize the integrated performance of NBS and gray infrastructure, providing a scalable, data-driven roadmap for long-term restoration. The s

Project Information FAQ

Project Information

4 Q
The project “Integrated restoration of priority river basins in Mexico” is an infrastructure initiative in the Water Supply and Storage sector, located in Mexico. Taiyo aggregates data on it from Inter-American Development Bank (IADB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

preparation

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The general objective of this TC is to develop a science-based implementation strategy to restore ecological quality and climate resilience in priority micro-basins. By leveraging the HydroBID suite to create a calibrated hydrological framework, the TC will optimize the integrated performance of NBS and gray infrastructure, providing a scalable, data-driven roadmap for long-term restoration. The specific objectives are: (i) develop a dynamic ecohydrological model to quantify the interactions between grey infrastructure, water quality, and NBS; (ii) establish a 20-year strategic roadmap and governance framework to institutionalize resilient sanitation and circular economy policies; and (iii) create a bankable five-year investment pipeline and operational plan to trigger immediate project execution and private sector participation.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data