Integrated River Engineering Project on the Danube East of Vienna
The status, timeline and source of this project. A free account opens every field.
Source: Keep.EU
This project is part of TEN-T Priority Project 18 and aims at providing a solution to riverbed erosion and at improving the ecological and nautical conditions on the freeflowing section of the Danube between Vienna and Bratislava. The project is the result of an integrative planning approach. On a length of about three kilometres, a pilot project at Bad Deutsch-Altenburg was started in February 20
- Status
- Under Construction
- Sector
- Water Supply and Storage, Power Generation (CCGT), Government, Manufacturing (Industrial)
- Location
- Austria
- Updated
- 22 Jul 2026
- Source
- Keep.EU
ConstructChat
Ask ConstructChat about Integrated River Engineering Project on the Danube East of Vienna
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | ongoing |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project is part of TEN-T Priority Project 18 and aims at providing a solution to riverbed erosion and at improving the ecological and nautical conditions on the freeflowing section of the Danube between Vienna and Bratislava. The project is the result of an integrative planning approach. On a length of about three kilometres, a pilot project at Bad Deutsch-Altenburg was started in February 2012 in order to test measures of the IREP in natura. On a section with a total length of about 48 km, from the Freudenau river power plant in Vienna to the Austrian-Slovakian border, the Danube is free-flowing. Due to reduced sediment transport downstream of the power plant in Vienna, a degradation of the riverbed has taken place since its completion in 1998, resulting in a decoupling of the river and its floodplains as well as in falling groundwater levels. Additional ecological deficits were caused by river engineering structures which were erected in past centuries and which endanger the habitats of typical local flora and fauna. Regarding navigable conditions, there are inadequate fairway depths and restricted fairway widths in this section, which negatively affect the competitiveness of inland waterway transport, both in Austria and on an international level, as the majority of transports on the Danube waterway on Austrian territory is of international and long-distance character. Objectives The Integrated River Engineering Project on the Danube East of Vienna is an integrated overall project with the following objectives: · Riverbed stability · Improvement of ecological conditions · Improvement of nautical conditions in low-water periods |
Budget |
Location
Country | Austria |
Source
Source reliability | Medium |
Source | Keep.EU |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Government, Manufacturing (Industrial) |
Article published date | 2023-07-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project