This project is part of TEN-T Priority Project 18 and aims at providing a solution to riverbed erosion and at improving the ecological and nautical conditions on the freeflowing section of the Danube between Vienna and Bratislava. The project is the result of an integrative planning approach. On a length of about three kilometres, a pilot project at Bad Deutsch-Altenburg was started in February 20

Status
Under Construction
Sector
Water Supply and Storage, Power Generation (CCGT), Government, Manufacturing (Industrial)
Location
Austria
Updated
22 Jul 2026
Source
Keep.EU

ConstructChat

Ask ConstructChat about Integrated River Engineering Project on the Danube East of Vienna

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Integrated River Engineering Project on the Danube East of Vienna” is an infrastructure initiative in the Water Supply and Storage sector, located in Austria. Taiyo aggregates data on it from Keep.EU.

Participants

Sponsoring Agency

Status

Original status

ongoing

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project is part of TEN-T Priority Project 18 and aims at providing a solution to riverbed erosion and at improving the ecological and nautical conditions on the freeflowing section of the Danube between Vienna and Bratislava. The project is the result of an integrative planning approach. On a length of about three kilometres, a pilot project at Bad Deutsch-Altenburg was started in February 2012 in order to test measures of the IREP in natura. On a section with a total length of about 48 km, from the Freudenau river power plant in Vienna to the Austrian-Slovakian border, the Danube is free-flowing. Due to reduced sediment transport downstream of the power plant in Vienna, a degradation of the riverbed has taken place since its completion in 1998, resulting in a decoupling of the river and its floodplains as well as in falling groundwater levels. Additional ecological deficits were caused by river engineering structures which were erected in past centuries and which endanger the habitats of typical local flora and fauna. Regarding navigable conditions, there are inadequate fairway depths and restricted fairway widths in this section, which negatively affect the competitiveness of inland waterway transport, both in Austria and on an international level, as the majority of transports on the Danube waterway on Austrian territory is of international and long-distance character. Objectives The Integrated River Engineering Project on the Danube East of Vienna is an integrated overall project with the following objectives: · Riverbed stability · Improvement of ecological conditions · Improvement of nautical conditions in low-water periods

Budget

Location

Country

Austria

Source

Source reliability

Medium

Source

Keep.EU

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Generation (CCGT), Government, Manufacturing (Industrial)

Article published date

2023-07-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project