logo

Integrated River Engineering Project on the Danube East of Vienna

Sector: Water Supply and Storage • Location: Austria

Source: Keep.EU

Project
Ongoing

This project is part of TEN-T Priority Project 18 and aims at providing a solution to riverbed erosion and at improving the ecological and nautical conditions on the freeflowing section of the Danube between Vienna and Bratislava. The project is the result of an integrative planning approach. On a length of about three kilometres, a pilot project at Bad Deutsch-Altenburg was started in February 20

Project Information FAQ

Project Information

5 Q
The project “Integrated River Engineering Project on the Danube East of Vienna” is an infrastructure initiative in the Water Supply and Storage sector, located in Austria. Taiyo aggregates data on it from Keep.EU.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

ongoing

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This project is part of TEN-T Priority Project 18 and aims at providing a solution to riverbed erosion and at improving the ecological and nautical conditions on the freeflowing section of the Danube between Vienna and Bratislava. The project is the result of an integrative planning approach. On a length of about three kilometres, a pilot project at Bad Deutsch-Altenburg was started in February 2012 in order to test measures of the IREP in natura. On a section with a total length of about 48 km, from the Freudenau river power plant in Vienna to the Austrian-Slovakian border, the Danube is free-flowing. Due to reduced sediment transport downstream of the power plant in Vienna, a degradation of the riverbed has taken place since its completion in 1998, resulting in a decoupling of the river and its floodplains as well as in falling groundwater levels. Additional ecological deficits were caused by river engineering structures which were erected in past centuries and which endanger the habitats of typical local flora and fauna. Regarding navigable conditions, there are inadequate fairway depths and restricted fairway widths in this section, which negatively affect the competitiveness of inland waterway transport, both in Austria and on an international level, as the majority of transports on the Danube waterway on Austrian territory is of international and long-distance character. Objectives The Integrated River Engineering Project on the Danube East of Vienna is an integrated overall project with the following objectives: · Riverbed stability · Improvement of ecological conditions · Improvement of nautical conditions in low-water periods

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

Medium

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data