Integrated Science and Engineering Building
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Design-Build services for the Integrated Science and Engineering Building. Design Build services for Integrated Science and Engineering Building. Project goal is to create a building that achieves net zero energy consumption and obtain LEED Platinum certification.
- Status
- Closed
- Sector
- Commercial, Residential, Manufacturing (Industrial)
- Location
- San Marcos, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Integrated Science and Engineering Building
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Design-Build services for the Integrated Science and Engineering Building. Design Build services for Integrated Science and Engineering Building. Project goal is to create a building that achieves net zero energy consumption and obtain LEED Platinum certification. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | San Marcos |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Residential, Manufacturing (Industrial) |
Article published date | 2024-04-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
