logo

Integrated Services and Healthy Rivers Project (ISHRP)

Sector: Water Supply and Storage • Location: Iraq

Source: World Bank Group

Project
Pipeline

The Integrated Services and Healthy Rivers Project (ISHRP) is a proposed US$600 million IBRD‑financed operation in Iraq. The project aims to improve access to safely managed water supply and sanitation services and strengthen the operational performance of water and wastewater service providers in selected areas. The project responds to severe water scarcity, deteriorating infrastructure, and high

Status
Prospective
Sector
Water Supply and Storage, Power Transmission, Power Generation (CCGT)
Location
Iraq
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Integrated Services and Healthy Rivers Project (ISHRP)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Integrated Services and Healthy Rivers Project (ISHRP)” is an infrastructure initiative in the Water Supply and Storage sector, located in Iraq. Taiyo aggregates data on it from World Bank Group.

Participants

Not available for this record.

Status

Original status

pipeline

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Integrated Services and Healthy Rivers Project (ISHRP) is a proposed US$600 million IBRD‑financed operation in Iraq. The project aims to improve access to safely managed water supply and sanitation services and strengthen the operational performance of water and wastewater service providers in selected areas. The project responds to severe water scarcity, deteriorating infrastructure, and high levels of untreated wastewater discharge that threaten public health, river ecosystems, and climate resilience, particularly along the Tigris River system. It will focus on rehabilitating and modernizing existing water and wastewater treatment plants, upgrading transmission and distribution networks, expanding sewerage systems in priority urban areas, and reducing non‑revenue water.ISHRP is designed as the first project in a Series of Projects. The initial phase prioritizes infrastructure rehabilitation, operational readiness, and institutional strengthening, while laying the foundation for future capacity expansion. Investments will be complemented by sector reforms, utility performance improvements, and enhanced monitoring and management systems. The project is expected to deliver significant benefits for millions of urban residents in Baghdad and selected governorates, while reducing pollution loads into the Tigris and its tributaries and improving water quality for downstream communities. It is aligned with Iraq’s national water and climate strategies and the World Bank Group’s Country Partnership Framework.

Budget

Location

Country

Iraq

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Transmission, Power Generation (CCGT)

Article published date

2026-05-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project