Integrated Services and Healthy Rivers Project (ISHRP)
Sector: Water Supply and Storage • Location: Iraq
Source: World Bank Group
The Integrated Services and Healthy Rivers Project (ISHRP) is a proposed US$600 million IBRD‑financed operation in Iraq. The project aims to improve access to safely managed water supply and sanitation services and strengthen the operational performance of water and wastewater service providers in selected areas. The project responds to severe water scarcity, deteriorating infrastructure, and high
- Status
- Prospective
- Sector
- Water Supply and Storage, Power Transmission, Power Generation (CCGT)
- Location
- Iraq
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Integrated Services and Healthy Rivers Project (ISHRP)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | pipeline |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Integrated Services and Healthy Rivers Project (ISHRP) is a proposed US$600 million IBRD‑financed operation in Iraq. The project aims to improve access to safely managed water supply and sanitation services and strengthen the operational performance of water and wastewater service providers in selected areas. The project responds to severe water scarcity, deteriorating infrastructure, and high levels of untreated wastewater discharge that threaten public health, river ecosystems, and climate resilience, particularly along the Tigris River system. It will focus on rehabilitating and modernizing existing water and wastewater treatment plants, upgrading transmission and distribution networks, expanding sewerage systems in priority urban areas, and reducing non‑revenue water.ISHRP is designed as the first project in a Series of Projects. The initial phase prioritizes infrastructure rehabilitation, operational readiness, and institutional strengthening, while laying the foundation for future capacity expansion. Investments will be complemented by sector reforms, utility performance improvements, and enhanced monitoring and management systems. The project is expected to deliver significant benefits for millions of urban residents in Baghdad and selected governorates, while reducing pollution loads into the Tigris and its tributaries and improving water quality for downstream communities. It is aligned with Iraq’s national water and climate strategies and the World Bank Group’s Country Partnership Framework. |
Budget |
Location
Country | Iraq |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Transmission, Power Generation (CCGT) |
Article published date | 2026-05-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
