Integrated Smart City Solutions Development Project- Phase V
Sector: Bridge • Location: Indore, Madhya Pradesh, India
Source: India Investment Grid (IIG)
Information Ministry of Housing & Urban Affairs has come up with Integrated Smart City Solutions Development Project- Phase V with a ticket size of 67.86 INR Crores. This project in Roads & Bridges sub-sector involves The current status of the project is Completion Certificate/COD and is being developed through the EPC route. Economic/Social Impact of the Project Smart Road Network including Cons
- Status
- Closed
- Sector
- Bridge, Power Generation (CCGT), Road, Government, Water Supply and Storage, Commercial, Residential
- Location
- Indore, Madhya Pradesh, India
- Updated
- 22 Jul 2026
- Source
- India Investment Grid (IIG)
ConstructChat
Ask ConstructChat about Integrated Smart City Solutions Development Project- Phase V
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Information Ministry of Housing & Urban Affairs has come up with Integrated Smart City Solutions Development Project- Phase V with a ticket size of 67.86 INR Crores. This project in Roads & Bridges sub-sector involves The current status of the project is Completion Certificate/COD and is being developed through the EPC route. Economic/Social Impact of the Project Smart Road Network including Construction of Central Median, laying of Electrical RCC duct, OFC duct, stormwater duct, shifting of existing overhead electrical line and various miscellaneous work in ABD area- Phase-V |
Original sector | Roads & Highways |
Procurement method | |
Budget |
Location
Country | India |
State | Madhya Pradesh |
City | Indore |
Source
Source | India Investment Grid (IIG) |
URL |
More Details
Record type | Project |
Sector | Bridge, Power Generation (CCGT), Road, Government, Water Supply and Storage, Commercial, Residential |
Article published date | 2024-03-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
