logo

INTEGRATED SOLAR COMBINED CYCLE POWER PROJECT

Sector: Road • Location: Morocco

Source: World Bank Group

Project
Closed

The main objective of the Integrated Solar Combined Cycle Power Project in Morocco is to add urgently needed capacity to the Moroccan power grid to help cope with the sustained growth in electricity demand, to increase the contribution of renewable energy sources in Morocco's energy mix which would reduce greenhouse gas emissions, and to contribute to a program of global environmental significance

Project Information FAQ

Project Information

5 Q
The project “INTEGRATED SOLAR COMBINED CYCLE POWER PROJECT” is an infrastructure initiative in the Road sector, located in Morocco. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The main objective of the Integrated Solar Combined Cycle Power Project in Morocco is to add urgently needed capacity to the Moroccan power grid to help cope with the sustained growth in electricity demand, to increase the contribution of renewable energy sources in Morocco's energy mix which would reduce greenhouse gas emissions, and to contribute to a program of global environmental significance. The project includes the integration of a parabolic trough solar field with a traditional natural gas based power generating unit (combined cycle). The project involves the construction and operation of a solar/fossil hybrid power station of about 472 MW, of which 452 MW2 from combined cycle gas turbine and 20 MW from the solar component with an expected annual net production of 3,538 GWh per year. The solar output is estimated at 1.13 percent of the annual production representing 40 GWh per year. The project has nine basic components: design, construction and operation of an integrated solar combined cycle power plant; construction of transmission lines; construction of a substation; construction of access roads; drilling of boreholes; land acquisition; gas pipeline construction; environmental and social development management; and consulting services.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data