INTEGRATED SOLAR COMBINED CYCLE POWER PROJECT
Sector: Road • Location: Morocco
Source: World Bank Group
The main objective of the Integrated Solar Combined Cycle Power Project in Morocco is to add urgently needed capacity to the Moroccan power grid to help cope with the sustained growth in electricity demand, to increase the contribution of renewable energy sources in Morocco's energy mix which would reduce greenhouse gas emissions, and to contribute to a program of global environmental significance
- Status
- Closed
- Sector
- Road, Solar, Power Generation (CCGT), Biomass, Wind, Natural Gas, Geothermal, Commercial, Government
- Location
- Morocco
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about INTEGRATED SOLAR COMBINED CYCLE POWER PROJECT
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The main objective of the Integrated Solar Combined Cycle Power Project in Morocco is to add urgently needed capacity to the Moroccan power grid to help cope with the sustained growth in electricity demand, to increase the contribution of renewable energy sources in Morocco's energy mix which would reduce greenhouse gas emissions, and to contribute to a program of global environmental significance. The project includes the integration of a parabolic trough solar field with a traditional natural gas based power generating unit (combined cycle). The project involves the construction and operation of a solar/fossil hybrid power station of about 472 MW, of which 452 MW2 from combined cycle gas turbine and 20 MW from the solar component with an expected annual net production of 3,538 GWh per year. The solar output is estimated at 1.13 percent of the annual production representing 40 GWh per year. The project has nine basic components: design, construction and operation of an integrated solar combined cycle power plant; construction of transmission lines; construction of a substation; construction of access roads; drilling of boreholes; land acquisition; gas pipeline construction; environmental and social development management; and consulting services. |
Original sector | FY17 - Energy and Extractives |
Budget |
Location
Country | Morocco |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Road, Solar, Power Generation (CCGT), Biomass, Wind, Natural Gas, Geothermal, Commercial, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
