Integrated Solar Radiation Data Sources over Australia
Sector: Manufacturing (Industrial) • Location: Australia
Source: Australian Renewable Energy Agency (ARENA)
CSIRO and its partners developed Australia’s first comprehensive solar radiation data set to help the solar energy industry measure and characertise the expected output of large scale solar power plants.Key resultsHigh standard solar radiation based tools for the solar industry require quality observation In principle a number of solar radiation data sources are available e.g. solar radiation coll
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | CSIRO and its partners developed Australia’s first comprehensive solar radiation data set to help the solar energy industry measure and characertise the expected output of large scale solar power plants.Key resultsHigh standard solar radiation based tools for the solar industry require quality observation In principle a number of solar radiation data sources are available e.g. solar radiation collected for agriculture purposes. In practice, however, their quality is disparate. So although these data can be used, the effort required to quality control and assure them should not be underestimated.The dearth of quality direct beam (the direct normal irradiance, DNI) observations together with the higher complexity of these data, compared to the more standard global horizontal irradiance (GHI), have meant that more time had to be spent in cleaning and interpreting these direct beam data.The signing of the agreement between CSIRO and NREL, a subcontractor to CSIRO in the project, took much longer than anticipated. Such unexpected delay, due to the complexity of the two organisations involved, led to both lengthy negotiations and delays in the execution of the project. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
