Integrated Study for Cofamosa Project (Awf)
The status, timeline and source of this project. A free account opens every field.
Source: African Development Bank (AfDB)
This project consist of a preparation study for the Committee for the Facilitation of Agriculture between Mozambique and South Africa (COFMOSA) Irrigation Project. The study will be conducted by a reputable and specialized consulting engineering firm over a period of 12 months. It will address various water resources management issues and design aspects the irrigation project including technical,
- Sector
- Raw Materials, Water Supply and Storage, Hydro, Government
- Location
- Mozambique
- Updated
- 22 Jul 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about Integrated Study for Cofamosa Project (Awf)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project consist of a preparation study for the Committee for the Facilitation of Agriculture between Mozambique and South Africa (COFMOSA) Irrigation Project. The study will be conducted by a reputable and specialized consulting engineering firm over a period of 12 months. It will address various water resources management issues and design aspects the irrigation project including technical, institutional, legal, social, cultural, economic, and environmental ones. The study will also include the preparation of semi-detailed designs and bill of quantities (BOQ) for the irrigation systems for the first phase of the project (10,000 ha). Additionally, the study will review and assess possible options for public-private partnership (PPP), as the Business Model, to manage the agriculture production based on irrigated sugar cane plantation, processing and marketing. After the conclusion of the feasibility study, the GoM in coordination with other stakeholder will organize a financial resources mobilization workshop to present the feasibility study findings and discuss financing plans with donors and private sector. |
Original sector | Agriculture, Forestry, Fishing |
Budget |
Location
Country | Mozambique |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Project |
Sector | Raw Materials, Water Supply and Storage, Hydro, Government |
Article published date | 2025-03-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Raw Materials projects in Mozambique
- Namaacha wind farm
- Companhia de Sena S.A.R.L.
- Sojitz Maputo Cellulose, Limitada (SOMACEL)
- Mozambique - Drought Recovery and Agriculture Resilience Project (DRARP)
- Mozambique - Massingir Dam Emergency Rehabilitation Project Supplementary Loan II (MDERP-SLII)
- Mozambique - Supplementary Loan to Montepuez - Lichinga Road Project
- Mozambique - The Massingir Dam Emergency Rehabilitation Project
- Auroz Limitada
