logo

Integrated Study for Cofamosa Project (Awf)

Sector: Water Supply and Storage • Location: Mozambique

Source: African Development Bank (AfDB)

Project

This project consist of a preparation study for the Committee for the Facilitation of Agriculture between Mozambique and South Africa (COFMOSA) Irrigation Project. The study will be conducted by a reputable and specialized consulting engineering firm over a period of 12 months. It will address various water resources management issues and design aspects the irrigation project including technical,

Project Information FAQ

Project Information

4 Q
The project “Integrated Study for Cofamosa Project (Awf)” is an infrastructure initiative in the Water Supply and Storage sector, located in Mozambique. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This project consist of a preparation study for the Committee for the Facilitation of Agriculture between Mozambique and South Africa (COFMOSA) Irrigation Project. The study will be conducted by a reputable and specialized consulting engineering firm over a period of 12 months. It will address various water resources management issues and design aspects the irrigation project including technical, institutional, legal, social, cultural, economic, and environmental ones. The study will also include the preparation of semi-detailed designs and bill of quantities (BOQ) for the irrigation systems for the first phase of the project (10,000 ha). Additionally, the study will review and assess possible options for public-private partnership (PPP), as the Business Model, to manage the agriculture production based on irrigated sugar cane plantation, processing and marketing. After the conclusion of the feasibility study, the GoM in coordination with other stakeholder will organize a financial resources mobilization workshop to present the feasibility study findings and discuss financing plans with donors and private sector.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data