logo
ProjectEnded

Integrated Surface Management

The status, timeline and source of this project. A free account opens every field.

Source: EU Funding & Tenders Portal

The project PJ.03a is part of the SESAR 2020 Multi Annual Program for the period 2016-2019. It is allocated to the Industrial Research & Validation phase, developed under the SJU Private Public Partnership and will contribute to the key feature High Performing Airport Operations. The future European ATM system relies on full integration of airports as nodes into the network. In this context, PJ.03

Status
Closed
Sector
Aerospace & Defense, Airport, Electric Vehicles (EVs), Manufacturing (Industrial), Automotive, Government
Location
Italy, France, Czechia, Austria, Germany, Spain, Belgium, Norway, Netherlands, Ireland, Switzerland, Hungary, Poland, Slovakia, Lithuania, Croatia, Sweden, Denmark, United Kingdom
Updated
22 Jul 2026
Source
EU Funding & Tenders Portal

ConstructChat

Ask ConstructChat about Integrated Surface Management

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Integrated Surface Management” is an infrastructure initiative in the Aerospace & Defense sector, located in Italy, France, Czechia, Austria, Germany, Spain, Belgium, Norway, Netherlands, Ireland, Switzerland, Hungary, Poland, Slovakia, Lithuania, Croatia, Sweden, Denmark, United Kingdom. Taiyo aggregates data on it from EU Funding & Tenders Portal.

Participants

Sponsoring Agency

Status

Original status

ended

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project PJ.03a is part of the SESAR 2020 Multi Annual Program for the period 2016-2019. It is allocated to the Industrial Research & Validation phase, developed under the SJU Private Public Partnership and will contribute to the key feature High Performing Airport Operations. The future European ATM system relies on full integration of airports as nodes into the network. In this context, PJ.03a is intended to identify and validate operational and technological solutions aiming at enhancing airport operations. One of the main objectives is to improve the predictability of ground operations in all weather conditions. The implementation of collaborative decision making process involving all relevant stakeholders will ensure an optimization of airport resources allocation. This feature will rely on enhanced integration between aircraft and ground systems which is expected to be achieved through the full implementation of the SWIM concept. It is also important to increase the efficiency and safety of airport operations by improving the current infrastructures and CNS systems. The availability of more accurate navigation information through the use of GNSS (augmented) systems, an automated switching of taxiway lights and (virtual) stop bars according to the AGL service, data link information exchange between controllers and pilots/vehicle and the on-board availability of advanced vision systems will result in an increased situational awareness with an impact on safety. PJ.03a will also focus on the integration of RPAS surface operations into airport operations to ensure, to the maximum extent possible, their compliance with the existing rules and regulations defined for an environment dominated by manned aviation. All those aspects will be assessed through ad hoc validation activities (both FTS and RTS) in different airport environments with different validation platforms to increase the significance of the results based on a broad range of representative layouts.

Location

Country

Italy, France, Czechia, Austria, Germany, Spain, Belgium, Norway, Netherlands, Ireland, Switzerland, Hungary, Poland, Slovakia, Lithuania, Croatia, Sweden, Denmark, United Kingdom

Source

Source

EU Funding & Tenders Portal

URL

More Details

Record type

Project

Sector

Aerospace & Defense, Airport, Electric Vehicles (EVs), Manufacturing (Industrial), Automotive, Government

Article published date

2026-01-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project