logo

INTEGRATED SWAMPS

Sector: Road • Location: Indonesia

Source: World Bank Group

Project
Closed

The main objective of the Integrated Swamps Development Project is to alleviate poverty in selected swamp schemes through further development of their agricultural potential. It will also assist the Government of Indonesia (GOI) in its management of part of the coastal zones and help ensure sound environmental practices in swamp development. The project will be implemented over a six year period (

Status
Closed
Sector
Road, Water Supply and Storage, Fertilizers, Waste Processing and Treatment, Raw Materials, Government
Location
Indonesia
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about INTEGRATED SWAMPS

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “INTEGRATED SWAMPS” is an infrastructure initiative in the Road sector, located in Indonesia. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The main objective of the Integrated Swamps Development Project is to alleviate poverty in selected swamp schemes through further development of their agricultural potential. It will also assist the Government of Indonesia (GOI) in its management of part of the coastal zones and help ensure sound environmental practices in swamp development. The project will be implemented over a six year period (1994-2000) in twenty existing swamp settlement schemes, covering a potential net cultivable area of about 55,000 ha, in Jambi, Riau and West Kalimantan Provinces which are among the poorest provinces in Indonesia. It will include the following main components: (a) rehabilitation of existing and construction of new water control structures, and support for better water management practices; (b) promotion of food crop production through support for research and extension with associated provision of seeds, pest control and seasonal inputs; (c) development of tree crops, including land titling and certification, in an area of about 12,500 ha; improvement of rural infrastructure through rehabilitation of existing or construction of new roads, bridges and jetties, and provision of potable water; and (e) improvement of coastal zones land use management, including the preparation of an Environmental Profile in West Kalimantan and support for the development of the Berbak National Park Buffer Zone in Jambi. Training and technical assistance will be provided to assist GOI agencies with the implementation of the project.

Original sector

FY17 - Agriculture, Fishing and Forestry,FY17 - Public Administration,FY17 - Water, Sanitation and Waste Management,Transportation

Budget

Location

Country

Indonesia

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Road, Water Supply and Storage, Fertilizers, Waste Processing and Treatment, Raw Materials, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project