Integrated Waste Management Complex
The status, timeline and source of this project. A free account opens every field.
Source: Sis.gov.eg
This project aims to establish an integrated waste management complex in 10th of Ramadan, focusing on recycling landfill waste and includes utility connections, internal road construction, and irrigation networks.
- Status
- Under Construction
- Sector
- Water Supply and Storage, Power Transmission, Manufacturing (Industrial), Waste Processing and Treatment, Power Generation (CCGT), Road
- Location
- 10th of Ramadan, Egypt
- Updated
- 22 Jul 2026
- Source
- Sis.gov.eg
ConstructChat
Ask ConstructChat about Integrated Waste Management Complex
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Under Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project aims to establish an integrated waste management complex in 10th of Ramadan, focusing on recycling landfill waste and includes utility connections, internal road construction, and irrigation networks. |
Original sector | Waste Management |
Location
Country | Egypt |
City | 10th of Ramadan |
Source
Source | Sis.gov.eg |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Transmission, Manufacturing (Industrial), Waste Processing and Treatment, Power Generation (CCGT), Road |
Article published date | 2025-03-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
