Integrated Waste Management Complex
The status, timeline and source of this project. A free account opens every field.
Source: Sis.gov.eg
The project aims to establish an integrated waste management complex in 10th of Ramadan, focusing on recycling landfill waste and includes utility connections, internal road construction, and irrigation networks for green spaces.
- Status
- Under Construction
- Sector
- Water Supply and Storage, Manufacturing (Industrial), Biomass, Road, Waste Processing and Treatment, Power Transmission, Power Generation (CCGT)
- Location
- 10th of Ramadan, Egypt
- Updated
- 22 Jul 2026
- Source
- Sis.gov.eg
ConstructChat
Ask ConstructChat about Integrated Waste Management Complex
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Under Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project aims to establish an integrated waste management complex in 10th of Ramadan, focusing on recycling landfill waste and includes utility connections, internal road construction, and irrigation networks for green spaces. |
Original sector | Environmental Management |
Location
Country | Egypt |
City | 10th of Ramadan |
Source
Source | Sis.gov.eg |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Manufacturing (Industrial), Biomass, Road, Waste Processing and Treatment, Power Transmission, Power Generation (CCGT) |
Article published date | 2025-03-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
