Integrated Waste Treatment Project in Xinjiang Uygur Autonomous Region
One of 10,000+ projects Taiyo tracks in China.
Source: World Bank Group
Shihezi Project will be implemented based on a PPP model for a concession period of 30 years. As an integrated waste treatment facility, the Project will cover the treatment of household waste, food waste and medical waste, with a total designed processing capacity of 655 tonnes/day, including a designed household waste processing capacity of 600 tonnes/day, a designed food waste processing capaci
- Status
- Prospective
- Sector
- Biomass, Hospital, Waste Processing and Treatment, Government, Hotel, Water Supply and Storage
- Location
- China
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Integrated Waste Treatment Project in Xinjiang Uygur Autonomous Region
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Shihezi Project will be implemented based on a PPP model for a concession period of 30 years. As an integrated waste treatment facility, the Project will cover the treatment of household waste, food waste and medical waste, with a total designed processing capacity of 655 tonnes/day, including a designed household waste processing capacity of 600 tonnes/day, a designed food waste processing capacity of 50 tonnes/day, and a designed medical waste processing capacity of 5 tonnes/day. Total investment stands at $ 71.51 million. SPV is Everbright Environment, a wholly owned subsidiary of the sponsor China Everbright. Concession was signed on December 7, 2021. https://www.cebenvironment.com/en/media/news_content-p211207.html |
Original sector | Municipal Solid Waste |
Procurement method | |
Budget |
Location
Country | China |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Biomass, Hospital, Waste Processing and Treatment, Government, Hotel, Water Supply and Storage |
Article published date | 2024-06-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Biomass projects in China
- Baoying Waste-to-Energy plant
- Jiangsu Zhangjiagang Solid Waste Integrated Treatment Plant
- Shandong Yucheng Waste-to-energy Plant Phase I
- Shandong Weishan Waste-to-Energy plant
- Jinzhai Kaidi Biomass Power Plant
- Rudong Biomass Pellet Facilities
- Lingbi Biomass plant
- Sanitary Landfill in Sanshui District of Foshan City
